carl105
carl105 carl105
  • 04-04-2016
  • Mathematics
contestada

what is In 7 days, a group of workers can plant 21 acres. What is their rate in acres per day?

Respuesta :

kelpel197
kelpel197 kelpel197
  • 04-04-2016
So do 21/7 to give you how much they do in a day. The answer is three so they do 3 aceres in a day.
Answer Link

Otras preguntas

jessicas shoebox is 20 centimeters long and 10 centimeters wide. how many more millimeters is the length of the shoebox than the width
Why does 2 pi divided by 1/3 equal 6 pi?
Show that 9x^2-17x-85=0 give you solutions to 3 correct significant figures There are two possible answers for x
If (3+y)/y=7, then y= Please help :)
find the area of a triangle given that c=40m b=20m a=48°
how do I solve (3+i)(3-i)
I am two numbers, the sum of my numbers is 100, the difference between my two numbers is 30,
How did the early voyages of discovery change european trade routes?
how do I solve (3+i)(3-i)
The fetus is nourished by the __________ during the first 7 weeks and by the _______ from week 8 through birth ?