kimbrachantel2962 kimbrachantel2962
  • 03-03-2020
  • Computers and Technology
contestada

The transition from ____ is initiated by the Job Scheduler according to some predefined policy. At this point, the availability of enough main memory and any requested devices is checked.

Respuesta :

isaacoranseola
isaacoranseola isaacoranseola
  • 04-03-2020

Answer: Hold to ready

Explanation:

This is when the process is waiting to be assigned to a processor. And this is carried out by the short term scheduler, so it can run. This state is immediately after the new state for the process.

Answer Link

Otras preguntas

A 3.7 kg object is lifted to a Hight of 3 meters what is the potential energy of this object
The traits of populations in the forest ecosystem have changed over time. What caused the traits to change?
Can someone help me please got to be in tomorrow
What area of the long bone is covered with cartilage
if square root of 405 rounded to the nearest thousandth is 20.125  how do u simplify to get to that answer, thank u.
Which is an example of bivariate data?(1) age of students in a club(2) grade level and age of students in a school(3) type of lunch each student orders at schoo
A climber is on a hike.after 2 hours he is at an altitude of 400 feet. After 6 hours, he is at an altitude of 700 feet. What is the average rate of change?
A climber is on a hike.after 2 hours he is at an altitude of 400 feet. After 6 hours, he is at an altitude of 700 feet. What is the average rate of change?
A toy rocket is shot vertically into the air from a launching pad 5 feel above the ground with an initial velocity of 80 feet per second. The height h, in feet,
n^2+7n+15=5 show work please