ginapogones6676 ginapogones6676
  • 02-07-2021
  • Business
contestada

A costing system that uses actual costs for direct materials and labor and predetermined overhead rates to apply overhead is called a(n)

Respuesta :

topeadeniran2 topeadeniran2
  • 07-07-2021

Answer: normal costing system

Explanation:

A costing system which uses the actual costs for direct materials and the labor and predetermined overhead rates to apply overhead is referred to as the normal costing system.

Normal costing system is the cost allocation method whereby cost is assigned to products which are based on the labor, materials, and the overhead which are used in their production.

Answer Link

Otras preguntas

Why is sequencing important? in coding
Which was not a source of heat for early Earth? A.asteroid and meteorite bombardment B.hydrothermal energy C. gravitational contraction D.radioactivity
One angle of a right triangle measures 64°. What is the measure of the other acute angle?
To select nonadjacent items, select the first item as usual, press and hold down the ____ key, and then while holding down the key, select the additional items.
simplify -4(n+9) A) -4n-36 B)-4n+9 C)-4n-9
MARKING AS BRAINLIEST LAST ATTEMPT! ( How did the constitution guard against tyranny )
What strategy will help you find the main idea of a passage? a. outline each paragraph c. Use question words such as who is this about? What did they do? b. rea
What is the role of decomposers in an ecosystem?
A person pushes a box. He applies a force of 400 newtons, and he pushes the box for adistance of 4 meters. After he stops pushing, the box slides forward anothe
How do I find the answer to 3a=12?