daijalala4321 daijalala4321
  • 04-06-2022
  • History
contestada

Which of the following is an example of a
Variable Cost?
A. an employee who makes $40,000 a year
B. purchasing raw materials when production increases
C. making a mortgage payment for building

Respuesta :

podsaidlauren
podsaidlauren podsaidlauren
  • 04-06-2022

Answer:

I think the answer for that is B.

Answer Link

Otras preguntas

So far, 37 miles of a new highway have been completed. This is one mile less than two thirds of the entire length. How long will the new highway be when complet
A stack of four hundred twenty cards is placed next to a ruler, and the height of stack is measured to be 7/8 inches. How thick is one card?
What is the term that describes the pattern or base pairing in dna?
What are basic physical quantities and it's measurement units? Make a chart.
Name four ways the environment contributes to economies
The sum of two trinomials ________.
how many drifferent position in the federal goverment require senate confirmation
What times what equals 18
Which is bigger 67% or 2/3
it takes earth about 365 days to orbit the sun.it takes uranus about 85 times as long write a numerical expression to describe the number of days it takes Uranu